Wednesday, August 31, 2016

Driveway Renovation II

And so we begin by taking the texture off of the driveway. It took two days with a six blade, gas powered chipping machine. Some friends from work helped me out.


First Day - have to use lots of water to cool the grinder and to sweep away the ground up pavement
First day got less than half done

Second Day


Lots of work grinding the cement


I dug up the garden and removed the sprinkler system piping

I also had to remove the rocks and underlayment

Look at all these extra rocks

Another pile of rocks. I like mulch much better because it is too hard to keep a rock garden in Florida
The neighbors didn't like this I'm sure. We left a foot of sludge in the gutter that took a month to wash away. There were streaks all over the road for days from people driving through the wet concrete run-off. We took as much as we could up and dumped it in low spots in the back yard where it was eroding.

This made me mad. We wore through three diamond tipped blades doing the driveway. Now Sunbelt Rentals charged me $100 to replace the blades! Excuse me, but do I have to buy new tires after I rent a car? No!